Wairakei Power Station, Taupo.
Nga Awa Purua Geothermal Power Station, Taupo.
W - Line 900NB Pipeline
Date: 2012
Client: Contact Energy
Location: Wairakei Power Station, Taupo.
Length: 1.3 km
Size: 900NB
Fast facts:
The W-Line is a 900Nb pipeline located at the Contact energy Wairakei Power Station, Taupo.
A new 900NB reinjection pipeline was required to transport the additional reinjection water produced by the new Te-Mihi Power Station to the Otupu reinjection wells located beside the main Taupo bypass highway.
The pipeline followed a difficult route between the side of the highway and Prawn Park, over a creek and through several culverts including a culvert under the main highway.
Warner Construction completed W-Line pipeline on time, to budget with no quality issues and with an excellent safety record of no incidents.
Fabrication and Installation carried out by Warner Construction:
Wellhead thrust frame
Wellhead and valve access platforms
Silencer
RK36 Production Wellhead Hookup
Date: 2017
Client: Mercury Energy
Location: Nga Awa Purua Geothermal Power Station, Taupo.
Length: 145m
Size: 350NB and 450NB pipe
Fast facts:
A new production well was commissioned by Mercury Energy alongside the exisiting RK13 and RK5 wells.
Warner Construction connected the well to the exisiting H-Line running back to the Nga Awa Purua Geothermal Power Station.
Fabrication and Installation carried out by Warner Construction:
Wellhead thrust frame
Wellhead and valve access platforms
Silencer