Ohanga Rd Pipeline, New Plymouth

Warner Construction strengthens its long-term partnership with Greymouth Petroleum, selected again as a preferred supplier for pipeline works due to their proven track record and ongoing positive working relationship.

The new pipeline installation from the Urenui well site to the Turangi production station was carried out over 5 months.

Ohanga Rd Pipeline

Date: 2024

Client: Greymouth Petroleum

Length: 4.5kms

Size: 4 inch pipe

Fast facts:

  • New pipeline required from the Urenui A Well site to Turangi A meeting/production station

  • Roadside traffic management provided by Warner Construction

  • Weld out pipe, 100% NDT tested, blast and wrap followed by jeeping for longevity testing before underground placement.