Kowhai A-D Twin Pipelines, Taranaki

M2PP Twin Line Realignment, Kapati Coast

Onaero Twin Pipelines, Taranaki

Kowhai A-D Twin Pipelines

Date: 2017

Client: Greymouth Petroleum

Location: Tikorangi, North Taranaki

Length: 2500m

Size: Twin 100NB

Fast Facts:

  • Working on an operational production station and operational drilling rig site were some of the obstacles of this project.

  • 3x 150mm under bores consisting of 2x4 inch steel pipes and 1x 40mm fibre optic conduit.

  • Holiday testing

  • Waitara River crossings with rock shield and timber slatting.

M2PP Twin Line Realignment

Date: 2014

Client: Vector Gas

Location: Waikanae Kapiti Coast

Length: Both lines 2kms

Size: 200NB and 300NB

Fast Facts:

  • This project consisted of Warner completing the realignment of two main gas lines along the Kapiti Coast. This realignment was carried out due to the new expressway being built.

  • Warner was able to complete all under bore sections with their own excavators and side booms.

  • Welding

  • Pipe bending

  • 100% NDT

  • Hydro testing

  • Drying

  • Coating application

  • Installation of ground anchors

  • Surveying

  • Hot tapping

  • Construction of a delivery point station along the new pipeline route.

Onaero Twin Pipelines

Date: 2013

Client: Greymouth Petroleum

Location: Onaero, North Taranaki

Length: 2.9km

Size: 100NB Twin line

The crossing of the Onaero River required a 160m under bore for both of the pipes.

The pipeline route comprised of a section of rural road with multiple services - some flat undulating farmland, a challenging hill section, river flats and a very steep section that required the installation of trench breakers.